How to create a 1500 m3 Containment in 4 days ???

The technical solutions we offer make it possible to simplify crisis management.
An example ? One of our partners wanted to build a confined area to perform complex repairs on contaminated xxl equipment.
We transformed an industrial room into a controlled area in less than a week, notably with the installation of a 25mX10mX6m tunnel. This sealed tunnel, connected to filtered differential pressure devices, made it possible to repair the equipment in the best possible working conditions.
Thank you to the EDF and Onet Technologie team members for their essential contribution.

FOLLOW OR CONTACT US

05 sept., 2024
🚀 Efficiency and Protection: The Custom Tunnel System 🚀
04 sept., 2024
🌟 Maximize Efficiency with Custom Pneumatic Solutions 🌟
29 août, 2024
🔧 Pneumatic Work Gates for Industrial Applications – Precision-Engineered for Optimal Efficiency
27 août, 2024
🔧 Custom Furniture for FME Zones and Other Areas – Merging Safety and Functionality
22 août, 2024
🏗️ Custom Industrial Tents – Your Solution for Flexible Workspaces and Secure Storage
20 août, 2024
🔒 Custom Protective Covers – The Key to Enhanced Safety and Efficiency
07 août, 2024
💡 Versatile Enclosures with One Tool ?
30 juil., 2024
😅 SUVA Warns...
18 juil., 2024
More Crucial Than Ever...
16 juil., 2024
Did You Know?
12 juil., 2024
💡 Illuminate and Secure the Darkness...
27 juin, 2024
Keep Cool And Carry On....
Plus de posts
Share by: